Project Schedule Planner

A project’s time is working time plus the labels’ waiting time. Put the waits in first, then the weekends, then a buffer.

Home › Calculators › Home projects › Project Schedule Planner

Opens on Chapter 26’s first worked example: the living room’s Saturday with the prep done on Friday: two coats of 300 and 270 minutes with the label’s 2-hour recoat wait, then cleanup, from 9:00 a.m., stopping by 10:00 p.m.

A day on the clock
Weekends on the calendar
A wait on the calendar
Enter your numbers, then press Work it out.

How it works

Read every label before you plan and write each wait between the steps it separates: recoat times (often 2 to 4 hours for water-based paint, about a day for oil), grout before sealing (often 1 to 3 days), acclimation for flooring (as long as its maker says). Cool or damp days dry slower. Order the work top down (ceiling, walls, trim, floor) and dusty work before finished surfaces. Count working days in weekends, and keep a buffer at the end.

From the book, Chapter 26. The Saturday finishes at 10:00 p.m., 84.6% of it working. With the prep on Saturday too, the second coat would end at 1:30 a.m., so it waits for Sunday and the room is done at 3:00 p.m.. Planks delivered Wednesday are ready Friday, June 18; the summer’s jobs finish Sunday, June 20, or Sunday, June 27 with the buffer. Every chapter and its tool →

The label rules. Coverage, waste, joint, drying and bag-chart numbers here are the book’s examples or common ranges; the numbers printed on your own can, bag or box, and its maker’s instructions, come first. Lengths can be typed as 148, 12 ft 4 in, 12' 4", 5 3/8 or 600 mm; numbers as 1,200, $45, 0.5, 3/4 or 1 1/2. Whole units (cans, boxes, boards, bags) are rounded up, lengths to the nearest 1/16 inch, money to the cent. Everything stays in your browser: no sign-up, nothing stored or sent.